Fire prevention system installation at PreGel Spa
N2 Oxygen Reduction System installation is proceeding and it will protect an High-bay warehouse 60 m long, 35 m wide and 44 m high.
Successful oxygen reduction fire prevention system installation at PreGel Spa, where we protect 24/7 from the fire risk two different automated storages of about 170.000 m3.
Besides, the installed OR-System is actively protecting some server rooms located in the main building!
To reduce energy consumption and maintenance costs, we have installed Isolcell #ADOX machines using VPSA technology.
For more info about this technology: https://lnkd.in/dhYMFj9
N2 Oxygen Reduction System installation is proceeding and it will protect an High-bay warehouse 60 m long, 35 m wide and 44 m high.
Isolcell’s oxygen reduction system technology has been chosen once again to protect a brand new high-bay warehouse of a well-known international company. Soon new updates!!
Newsletter about our oxygen reduction system: a new topic will be published every week
Copyright 2023 © Isolcell SpA | Privacy Policy | Cookie Policy